Skip to main content

Notice of slip road closure - N18 (J5) on 25/2/2021

23 February 2021

Notice is hereby given that ColasRoadbridge JV, on behalf of TII, plan to carry out a pavement repair on the N18, at the bottom of the southbound on-slip from Junction 5 (Cratloe). In order to carry out these works safely there is a requirement to close the on-slip, and reduce the number of lanes on the southbound N18 from dual to single. We intend to carry out these works off peak to minimise disruption, with works planned to start at 7:00 p.m. on Thursday 25th February 2021. As soon as the pothole is repaired we will reopen the slip road and remove TM (estimated before 00:00). During the closure traffic will be facilitated at Setrights Junction with an alternative route via N18 J6 Bunratty, see diversion route below for information.

Related Documents

Page last updated: 23/02/21

Back to top