Project Update
The Design Update that was published in 2024 included a combination of active travel measures for walking and cycling, improvements to public transport, along with new and improved road infrastructure between Drumgeely roundabout and Knockbeagh Point roundabout on approach to Shannon International Airport.
Since the conclusion of the October 2024 Project Update, the design team have finalised the design and completed the Statutory Documentation for submission of the proposed planning application to An Coimisiún Pleanála.
The proposed scheme drawings and interactive map is also available for viewing on the project website www.shannonaccess.ie
For further information visit www.shannonaccess.ie or contact the project team at info@shannonaccess.ie or telephone (065) 6866147.
The Phase 3 AA Screening Report and AA Screening Determination have been completed as part of the Phase 3 deliverables and are now available at the links below: