Notice is hereby given in accordance with Section 75 of the Roads Act 1993 of Clare County Council’s intention to close the roads detailed hereunder for the period stated to facilitate the installation of a flood relief culvert carried out by Ward and Burke Construction Ltd.

 Roads to be closed:      

Phase 1

•         R-458-18 Clare Road, outbound lane at the St. Flannan’s Roundabout

•         L-4500 Toberteascain Road at the St. Flannan’s Roundabout

•         A three way traffic light system will be in place on the R-458 Limerick Road and the L-4506 College View

 Date and time of closure:                                                                                                    

For a three week period between the dates of January 13th 2020 and April 10th 2020

 

Phase 2

•         R-458-18 at the St. Flannan’s Roundabout

•         A three way traffic light system will be in place on the R-458 Clare Road, the L-4506 College View, and the L-4500 Toberteascain Road

 Date and time of closure:                                                                                                      

For a two week period between the dates of January 13th 2020 and April 10th 2020

 

Phase 3

•         R-458-18 Clare Road, inbound lane at the St. Flannan’s Roundabout

•         L-4506-0 College View at the St. Flannan’s Roundabout

•         A three way traffic light system will be in place on the R-458 Clare Road and the L-4500 Toberteascain Road

 Date and time of closure:                                                                                                      

For a three week period between the dates of January 13th 2020 and April 10th 2020

 

Phase 4

  • L-4506-0  College View

Date and time of closure:                                                                                                      

For a five week period between the dates of January 13th 2020 and April 10th 2020

Alternative routes / diversions;

Traffic travelling towards the town centre from the Clareabbey Roundabout can divert west along the N85 where they can turn right at the roundabout onto the N68 then continue to the Kilrush Road Roundabout where you can turn right onto the R475 (Kilrush Road). Traffic will continue on the R475 until the junction of the R-458. Visa Versa in opposite direction.

Three way Stop and Go will be introduced where possible to minimise the overall effects of further works on the St Flannan’s Roundabout

Observations / representations may be made in writing to the Administrative Officer, Clare County Council, Roads and Transportation Department, Áras Contae an Chláir, New Road, Ennis, Co. Clare, before 4:00 p.m. on 13th December 2019.