Fire safety certificate fees

Standard or revised fire safety certificate

  1. Works in connection with the construction or extension of a building: €125.00, or €2.90 for each square metre of relevant floor area, whichever is the greater
  2. Works in connection with:
    1. the material alteration of the interior of a building: €125.00, or €2.90 for each square metre of relevant floor area, whichever is the greater
    2. the material alteration of the external surfaces of a building: €125.00
    3. a combination of (i) and (ii)  above: €125.00, or €2.90 for each square metre of relevant floor area, whichever is the greater
  3. A building in which a material change of use takes place: €125.00, or €2.90 for each square metre of relevant floor area, whichever is the greater
  4. Works or a building, where the building concerned will be used as an agricultural building: €65.0, or €0.80 for each square metre in excess of 300 sq.m. of (i) gross floor area being provided, or (ii) relevant floor area, as the case may be,whichever is the greater.

The maximum fee for a fire safety certificate is €12,500.00

Back to top

7 Day notice

  1. Works in connection with the construction or extension of a building: €250.00, or €5.80 for each square metre of relevant floor area, whichever is the greater
  2. Works in connection with:
    1. the material alteration of the interior of a building: €250.00, or €5.80 for each square metre of relevant floor area, whichever is the greater
    2. the material alteration of the external surfaces of a building: €250.00
    3. a combination of (i) and (ii)  above: €250.00, or €5.80 for each square metre of relevant floor area, whichever is the greater
  3. A building in which a material change of use takes place: €250.00, or €5.80 for each square metre of relevant floor area, whichever is the greater
  4. Works or a building, where the building concerned will be used as an agricultural building: €130.00, or €1.60 for each square metre in excess of 300 sq.m. of (i) gross floor area being provided, or (ii) relevant floor area, as the case may be,whichever is the greater.

The maximum fee for a 7 Day Notice is €25,000.00

Back to top

Regularisation certificate

  1. Works in connection with the construction or extension of a building: €500.00, or €11.60 for each square metre of relevant floor area, whichever is the greater.
  2. Works in connection with:
    1. the material alteration of the interior of a building: €500.00, or €11.60 for each square metre of relevant floor area, whichever is the greater
    2. the material alteration of the external surfaces of a building: €500.00
    3. a combination of (i) and (ii) above: €500.00, or €11.60 for each square metre of relevant floor area, whichever is the greater
  3. A building in which a material change of use takes place: €500.00, or €11.60 for each square metre of relevant floor area, whichever is the greater
  4. Works or a building, where the building concerned will be used as an agricultural building: €260.00, or €3.20 for each square metre in excess of 300 sq.m. of (i) gross floor area being provided, or (ii) relevant floor area, as the case may be,whichever is the greater.

The maximum fee for a Regularisation Certificate is €50,000.00

Voluntary organisations are exempt from fire safety certificate fees.